Construction defects · Fort Lauderdale and Broward County
Fort Lauderdale Construction Defect Expert Witnesses
Oxley provides construction expert opinions on condition, workmanship, repair scope and cost of remedy for high-rise and condominium buildings in Fort Lauderdale and Broward County.
Oxley serves Fort Lauderdale and Broward County construction defect matters from its office at 13830 58th St N, Suite 403, Clearwater, FL 33760. The firm does not maintain a Fort Lauderdale office. We travel for depositions, mediations, site visits and document reviews in downtown Fort Lauderdale and elsewhere in Broward County.
Dan has testified in six matters involving construction defect damages on high-rise, mid-rise, or condominium buildings.
HVHZ, Broward recertification and oceanfront condominiums
Broward County is also in Florida’s High Velocity Hurricane Zone, so exterior products and installations on many Fort Lauderdale and Broward buildings have to meet those wind-resistance requirements. The county requires recertification of existing buildings. This page does not state a recertification interval, because those requirements are set by local ordinance and can change. Fort Lauderdale and the Broward coast have a large oceanfront condominium stock. Assignments often involve garage and balcony restoration, along with questions about condition, workmanship, repair scope and cost of remedy on those towers. Broward service coverage includes Hollywood, Hallandale Beach, Pompano Beach, Lauderdale-by-the-Sea, Deerfield Beach and Dania Beach, along with downtown Fort Lauderdale and the city’s coastal areas. Oxley provides construction expert opinions on condition, workmanship, repair scope and cost of remedy. Structural engineering opinions come from a licensed engineer, and Oxley works alongside the engineer retained in the matter. Disputes often follow turnover from the developer to the association, or a milestone inspection report.
After the 2021 Surfside condominium collapse, Florida law added milestone inspection and structural integrity reserve study (SIRS) requirements for many existing condominium and cooperative buildings. Those reviews can raise questions about condition, workmanship, repair scope and cost of remedy. Oxley’s work is not a statutory milestone inspection or a structural integrity reserve study.
Broward courts and forums
Matters are heard in the Seventeenth Judicial Circuit and in the Southern District of Florida, Fort Lauderdale Division.
Who does the work
Daniel R. Zorrilla, J.D., BSBC, CGC, CFCC, is Oxley’s President and has testified as a construction defect expert in court and in arbitration. He has been in construction since 1991, including project management on mid-rise and high-rise residential projects in South Florida, and in consulting and expert work since 2008. Dan has testified in six matters involving construction defect damages on high-rise, mid-rise, or condominium buildings. Full profile →
Brian C. Moye, CBC, is a Managing Director whose work includes construction defects, repair scope and methodology, and construction costs. He has been in construction since 2004 and has been a Florida Certified Building Contractor since 2006. He has testified in more than 75 cases in state and federal court on property damage estimating and construction. His background includes high-rise renovations and project management for high-rise and commercial restoration following hurricanes. Full profile →
The assignment determines which team members contribute. CVs and testimony histories are available to counsel on request.
How a defect assignment is approached
The work starts with the condition as it actually exists, then compares as-built work to what the documents required, then considers repair alternatives and cost information that relate to the assigned questions. Oxley provides construction expert opinions on condition, workmanship, repair scope and cost of remedy. Structural engineering opinions come from a licensed engineer, and Oxley works alongside the engineer retained in the matter. When a claim calls for water testing, Oxley retains outside engineers or testing firms and works their results into the analysis.
Oxley acts for only one party on a project. Fees do not depend on the findings. Any earlier role on the project is disclosed at intake.
Possible assignment outputs
- Assessment of alleged defects against the contract documents and applicable requirements
- Analysis of workmanship, materials and installation against the contract documents, with design questions coordinated with the retained architect or engineer.
- Cost of remedy, with betterment identified separately
- Technical findings and, when part of the engagement, expert testimony
Frequently asked questions
Does Oxley have an office in Fort Lauderdale and Broward County?
No. Oxley serves Fort Lauderdale and Broward County construction matters from its office at 13830 58th St N, Suite 403, Clearwater, FL 33760. The firm does not maintain a Fort Lauderdale office. We travel for depositions, mediations, site visits and document reviews in downtown Fort Lauderdale and elsewhere in Broward County.
What defect work does this page cover?
This page is focused on high-rise and condominium construction defect work in Fort Lauderdale and Broward County. A defect assignment may examine condition, workmanship, repair alternatives or cost.
Do milestone inspections and structural integrity reserve studies change the work?
After the 2021 Surfside condominium collapse, Florida law added milestone inspection and structural integrity reserve study requirements for many existing condominium and cooperative buildings. Oxley’s work is technical consulting and expert opinion when those questions are in dispute. It is not a statutory milestone inspection or a structural integrity reserve study.
Who are the testifying experts?
Daniel R. Zorrilla, J.D., BSBC, CGC, CFCC, has testified as a construction defect expert in court and in arbitration. Dan has testified in six matters involving construction defect damages on high-rise, mid-rise, or condominium buildings. Brian C. Moye, CBC, provides opinions related to construction defects, repair scope and construction costs, and has testified in more than 75 cases in state and federal court on property damage estimating and construction.
Does Oxley act for both sides on the same project?
No. Oxley acts for only one party on a project. Fees do not depend on the findings. Any earlier role on the project is disclosed at intake.