Pasco County Construction Delay Expert Witnesses
Forensic schedule analysis, expert reports and testimony on construction delay for growth-area, utility and public projects in Pasco County, led by Daniel R. Zorrilla, J.D., BSBC, CGC, CFCC.
The short answer
What a construction delay expert does on a Pasco County matter
Oxley provides construction delay expert witness services to counsel and parties in Pasco County construction disputes. Daniel R. Zorrilla, J.D., BSBC, CGC, CFCC, leads the work as testifying expert. He examines the baseline, the schedule updates and the project records to determine whether completion was delayed, which events affected the critical path, and how much time each accounted for. How concurrent delay is treated depends on the contract and applicable law, which are for counsel and the tribunal.
The method is chosen to fit the contract and the records, stated in the report and explained in testimony at deposition, trial or arbitration, and presented at mediation. The analysis addresses the record, including evidence that cuts against the retaining party.
Oxley’s office is at 13830 58th St N, Suite 403, Clearwater, FL 33760. It is about 29 miles by road from the West Pasco Judicial Center in New Port Richey. Oxley does not keep a Pasco County office.
- Testifying expertDaniel R. Zorrilla, J.D., BSBC, CGC, CFCC, President
- Scheduling teamDavid Hengelbrok, P.E., PSP, and Jeremy Easen, BSBC, CGC
- TestimonyDan has testified in more than 40 cases, in state and federal court and in arbitration. He has been retained as a consultant or expert in more than 100 construction matters.
- Phone727-821-9190
Pasco County projects
What delay looks like on Pasco County projects
Pasco County sits immediately north of Pinellas and Hillsborough. Much of its recent construction is growth work: new residential communities and the roads, utilities and schools that serve them, especially around Wesley Chapel and Land O’Lakes. There is also redevelopment and public work in New Port Richey, Port Richey, Dade City and Zephyrhills.
On projects like these the schedule often depends as much on site work, utilities and approvals as on vertical construction. A master-planned community is built in phases that depend on each other, so a slip in one phase’s infrastructure can push every phase after it. Plat recording, utility acceptance and certificate of occupancy dates can decide when the next phase may start and when a builder may sell or lease.
Developers often build roads and utilities that are later turned over to a public owner, so inspection, acceptance and turnover dates can control the critical path. A pipeline or plant is scheduled by system and tie-in outage, and a road widening by segment and traffic phase. School and public buildings add owner-furnished items, agency approvals and fixed opening dates.
Delays on this kind of work come from utility relocations, right-of-way, permits, design changes and weather. The critical path can move between segments or phases, so the analysis has to follow those shifts with the contemporaneous updates and not with one summary of the whole job.
Weather, including summer storms and tropical systems, affects site work and paving through much of the year, and wet ground can stop earthwork and utility trenching for days. Developers also carry financing and sales commitments, so a late phase can have consequences well beyond the construction contract.
Delay can also trace to contractor staffing, subcontractor performance, sequencing and rework. A fair analysis weighs those causes alongside owner-side and approval-agency causes and states which events the records support.
Records
Records that matter most in a Pasco County delay claim
Delay opinions rest on dated records. These are the records that usually matter most on this kind of project, and the earlier they are preserved, the more an analysis can support.
- Native schedule files for the baseline and every update, with the narratives that came with them
- Owner, architect and contractor (OAC) meeting minutes and three-week look-aheads
- Submittal and procurement logs, with approval and delivery dates
- Notices, time extension requests and change orders, with the owner’s responses and dates
- Site work and utility logs, including tie-in and outage dates
- Permit and approval submittal dates and the agency responses
- Plat recording, utility acceptance and certificate of occupancy dates for each phase
- Phase turnover and acceptance documents for each phase of a community or corridor
- Weather records and the contract’s weather day provisions
- Daily reports and dated photographs showing crews and work areas
With those records the analysis can tie each period of delay to a documented event and to the dates in the record. How the contract allocates that time is for counsel and the tribunal.
For a subcontractor, the analysis also uses the general contractor’s updates as issued, the look-aheads and the subcontract’s schedule and notice terms.
Method
How the analysis method is chosen
Oxley chooses the analysis method to fit the contract and the records, including windows analysis, as-planned versus as-built comparison, time impact analysis and as-built reconstruction, as described in AACE International Recommended Practice No. 29R-03. The report names the method and explains why it fits. Method detail is on the construction delay expert witnesses page.
Courts and forums
Where Pasco County delay disputes are heard
State court: Sixth Judicial Circuit (Pinellas and Pasco). In Pasco County, circuit and county matters are heard at the West Pasco Judicial Center, 7530 Little Road, New Port Richey, and at the Robert D. Sumner Judicial Center, 38053 Live Oak Avenue, Dade City.
Federal court: Middle District of Florida, Tampa Division, 801 N. Florida Ave., Tampa, which includes Pasco County.
Appeals and arbitration: state appeals go to the Second District Court of Appeal, headquartered in St. Petersburg, and federal appeals to the Eleventh Circuit. Private contracts frequently call for AAA arbitration or another agreed procedure. Dan has testified in arbitration as well as in court.
In every forum the delay opinion has to rest on a stated method and on the project records. The analysis follows the governing contract and the forum’s rules on expert testimony.
Who does the work
Daniel R. Zorrilla, J.D., BSBC, CGC, CFCC
Dan Zorrilla is Oxley’s President and testifying expert on construction schedule delay, disruption, lost productivity, cumulative impact and related damages. He has been in construction since 1991 and in consulting and expert work since 2008. He managed construction for national and regional general contractors before 2008 and returned to project management in 2014–2015. He is a Florida Certified General Contractor, an AACE International Certified Forensic Claims Consultant, a Panelist of the American Arbitration Association, and a member of The Florida Bar. He does not practice law. Work through Oxley is technical consulting, not legal representation. Full profile →
David Hengelbrok, P.E., PSP, and Jeremy Easen, BSBC, CGC, support the scheduling and delay analysis.
Oxley acts for only one party on a project, and fees do not depend on findings. Any earlier role on the project is disclosed at intake.
When this comes up
Situations that call for a delay expert
- Completion delay and related cost consequences are disputed
- An owner needs to test a contractor’s time extension request or support a liquidated damages assessment
- An extension request or a liquidated damages assessment is contested
- An opposing expert’s delay analysis needs a response
- Counsel needs an early view of what the schedules actually support
- Schedule analysis is needed while the project is still running. See schedule review and analysis and delay analysis for contractors
Related work includes delay damages and disruption.
FAQ
Pasco County construction delay expert witnesses: common questions
Does Oxley have an office in Pasco County?
No. Oxley’s office is at 13830 58th St N, Suite 403, Clearwater, FL 33760, about 29 miles by road from the West Pasco Judicial Center in New Port Richey. The team travels for depositions, mediations, site visits and records work in Pasco County.
What does a construction delay expert witness do?
A delay expert examines the schedules and records to determine whether completion was delayed, which events affected the critical path and how much time each accounted for. The expert states the method and its limits in a report and in testimony at deposition, trial or arbitration, and presents the analysis at mediation.
Who is the testifying expert?
Daniel R. Zorrilla, J.D., BSBC, CGC, CFCC, is Oxley’s President and testifying expert on schedule delay, disruption and related damages. David Hengelbrok, P.E., PSP, and Jeremy Easen, BSBC, CGC, support the scheduling and delay analysis. His CV and testimony history are available to counsel on request.
Which courts hear Pasco County construction delay disputes?
State cases are heard in the Sixth Judicial Circuit at the West Pasco Judicial Center in New Port Richey and the Robert D. Sumner Judicial Center in Dade City. Federal cases are heard in the Middle District of Florida, Tampa Division. Many construction contracts send disputes to arbitration instead. Dan has testified in arbitration as well as in court.
When should an owner, contractor or counsel bring in a delay expert?
Often earlier than expected. An owner may need to test a contractor’s time extension request or support a liquidated damages assessment. A contractor may need to document delay when a phase turnover is late and the cause is disputed. Counsel may need a view before mediation or when an opposing delay analysis needs a response. On growth-area work an early limited look can show whether the site work, utility and approval records are complete enough to support an analysis.
Does Oxley act for both sides on the same project?
No. Oxley acts for only one party on a project, and fees do not depend on the findings. Any earlier role on the project is disclosed at intake. Oxley provides technical consulting, not legal representation.